Speed

By revolutionising the critical path of construction, a building can be finished off and brought to market for sale or rent much more quickly than a traditionally built structure.

  • Panels are pre-cut in the factory to pre-determined design and engineering specifications, with the complete kit delivered to site ready for erection.

  • This means reduced installation times of at least 60% compared to traditional build, which makes Panablok ideal for rapid, large scale developments. A complete Structural Envelope (walls, floors and roof) for a large detached house can be erected by a small team in a matter of days.

    • Entirely “dry fix” construction means no drying out time. Internal fit out can start immediately, resulting in quicker (and more profitable) construction times!

    • Using Panablok as a complete structural “envelope” (a single product for walls, floors and roofs) removes delays caused by third party suppliers.

    Typical TimeframeWeek 1/2Week 3/4Week 3/5Week 5/6
    Panablok Design From Receipt Of Architect's Drawings✔︎
    Construction Design & Structual Engineering✔︎
    Manufacture & Dispatch to Site✔︎
    Installation✔︎